The Road Tour was called to order by Jon LeBlanc at 8:00 a.m. Also on the tour were Jon LeBlanc, Barb Czarnecki, Kyle Cummings and Gary Klein
All roads toured with the exception of gravel roads and roads being chip sealed this year.
Observed were:
- Osprey Road: at the intersection with Worlds End Road and Osprey needs mastic seal
- World’s End Road: certain parts need crack filling. Gary will reach out to Statewide Surfacing to inspect.
- Buckhorn Road: crack fill from Fire #6976 to the end
- Tiger Musky Road: replace 2 culverts and crack fill certain sections
- Blueberry Road: chip seal
- Big Musky Road: mastic & chip seal
- Pines Road: after logging project completed in 2027 a portion of this road needs to be repaved
Road Tour ended at 10:38 a.m.
Jon LeBlanc, Chair